top of page

Hydroponic Lighting Management Units- Urban Green Farms. Enables gardeners to safely and easily control their grow lights.

 

The LMU serves 3 main functions:

 

  • Time Control: LMU can simulate any light cycle by using the 24-Hour timer.
  • Power Control: LMU can control, distribute and protect the load by using the circuit breakers.
  • Time Delay: This feature reduces the startup current and prevents voltage drop in the network by staggering the ignition of the load.

Hydroponics Axis Complete Light Management LMU

PriceFrom $220.00
GST Included
    •  LMU24 = 24 timed sockets. These timed sockets control the light cycle of connected ballasts using the 24-Hour Timer.
    • 3- 4LIVE: NUMBER OF LIVE SOCKETS 4LIVE = 4 always-on LIVE sockets. These can be used for fans, pumps, heaters or other appliances.
    • 4- 12ON / 12OFF: SIDE A / SIDE B OPERATION This indicates the number of HALF ON / HALF OFF sockets. 12ON / 12OFF = 12 times sockets are on while 12 time sockets are off.
    • 5- 24ON: ALL ON OPERATION This indicates the number of ALL ON sockets. 24ON = 24 timed sockets will be on at once.
    • 6- TIME DELAY: LMU IS EQUIPPED WITH TIME DELAY. 7- 1 PHASE/240V: INCOMING VOLTAGE TYPE This indicates the incoming voltage type of the LMU, either 1 PHASE/240V or 3 PHASE/415V. 8- 100A MAX: MAXIMUM PEAK CURRENT RATING This is the maximum load that can be safely supported by the LMU. This maximum should only be sustained for 4 hours. 9- 80A CONTINUOUS: MAXIMUM CONTINUOUS CURRENT RATING This is the maximum load that can be safely supported by the LMU in continuous, 24-hour operation. 10- 50Hz: INCOMING POWER FREQUENCY Both 1 PHASE and 3 PHASE power have a frequency of 50Hz in Australia and New Zealand.

Related Products

bottom of page